Construction of the Trinity Center continues at a swift pace from top to bottom! A layer of the roof is being installed while the pool is being excavated. More than 80 masons are on site, building the exterior and interior walls, and are laying 3,000 cinder blocks a day!

Excavation continues (below) for the pool and spa.