Trinity Center for Women and Girls In Sports
Construction Photos
August 2002

Scaffolding fully surrounds the Trinity Center for Women and Girls as construction continues at a swift pace from top to bottom! Nearly 120,000 bricks are being installed to create the exterior finish, along with precast concrete. The roof is completely enclosed with layers of insulation and an ice and water shield, and is being prepared for the installation of 45,000 red clay tiles. In the gymnasium, scaffolding has been erected for the installation of electrical wiring and the sprinkler system. Railings are being installed along the walking track, and windows will soon be installed in the arches.

Inside, the pool and spa have been excavated and are being completed with gunite, plaster and tile. The concrete slab around the pool has been poured, and all of the pool filters have been installed. Tile is being installed in the men's locker room (below).
In the Fitness Center in the sub-basement of Alumnae Hall, drywall is being installed; wall sconces have been installed and the ceiling has been painted - and has been completed with a drop grid ceiling. Tile is being installed in the restrooms and wet training room. Finishing touches are being added, including Corian windowsills, and purple and gold paint on the angled columns.