The
footprint of the Trinity Center is taking shape as concrete is being
poured into wood forms and concrete blocks are being placed to create
the building's foundation walls. Extensive networks of pipes for plumbing
and conduits for electrical wiring are being installed, and the concrete
slab will soon be poured to create the lower pool level of the Trinity
Center. Columns of reenforced concrete are being poured to support
the gymnasium on the second level. These are the most recent images
of the construction site. As the Trinity Center grows , we will add
more images. |
 |
 |
|
|
|
 |
 |
|
|
|
|
|
|
 |
 |
|